Data Center Construction

Innova offers Data Center  installation, upgrade , move and relocation.

Whether the application requires a modest computer room environment or a sizable data center housing multiple mainframe computers and hundreds of file servers, INNOVA approaches its design work to result in flexible and functional solutions, that meet current and future technology requirements. Attention is also given to the ergonomic design of the cable placement and equipment layout to ensure that people are efficient and productive while enabling for accessibility of services.



          EQUIPMENT RACKS, KVM AND OTHER DATA CENTER PRODUCTS

          PRE CONSTRUCTION
Preliminary budgets, project selection and registration with manufacture and distribution partners

          DESIGN/BUILD-RCDD ON STAFF
Sole responsibility on design, quality, schedule and pricing of a project allowing the customer to utilize a facility faster.

          INSTALLATION
Category 5E, Category 6, 10 Gig over copper, fiber and coax by BICSI and manufacturer certified technicians.

          DOCUMENTATION
As-builts, test results, site survey and elevation drawings

          Rack-Stack-Patch:

          Core-Edge Network Installations

          Server Blade Center Installations

          Day 1 Pre-Patching

          Physical Network Audits:

          Serial Number

          Device Name

          Asset Tag Number

          Date of Installation

          Certifications and Technical Support:

          CCNA/CCNP Engineering Services on staff

          Outsource of IT Engineering Services

          Pre-configuration, Staging, Burn-in, Installation & Integration

          ENERGY USAGE ASSESSMENT
Install metering equipment on multiple loads to evaluate and set a baseline for energy consumption.

          SOLUTIONS
Design and install energy management systems to monitor and control customers loads based on the Energy Usage Assessment

          RELIABLE & COST EFFECTIVE
With the use of proven technologies and our knowledge base, we offer reliable and cost effective solutions to fit our customers' needs and budget

          REPORTING & CONTROL
With our open source software, our customer can monitor, record and control multiple sites from one location.

          CFD ANALYSIS

          DATA CENTER CLEANING

          FLOOR LEVELING – WITHOUT TAKING DOWN EQUIPMENT